Candy P 700__1 SP CX User Manual Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 18
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
INSTRUCTIONS FOR ASSEMBLY OF THE HOB
TO THE GAS SUPPLY PIPES
These instructions are for Fitters qualified for installation of equipment in line with the
relevant national standard. All work must be carried out with the electricity supply dis-
connected.
ASSEMBLY PROCEDURE
2 Spanners, sizes 17 and 23 mm are required.
1/2 GAS
A) As illustrated, as-
semble parts in se-
quence:
A) fixed pipe
B) washer
C) Elbow fitting with
tapered thred
connection
2) Tighten the joints
with the Spanners,
remembering to twist
the pipes into position
before tightening.
3) Attach fitting C to
mains gas supply us-
ing rigid copper pipe
or flexible steel pipe.
VERY IMPORTANT
For ease of installation and to avoid gas leaks, it is recommended to con-
nect the pipes as follows:
First connect the pipe to the Hob
and then
Connect the pipe to the gas supply.
In this sequence is not followed, there is a danger that gas will be trapped
in the pipe.
AFTER INSTALLATION, CHECK THE TIGHTNESS OF ALL JOINTS USING
A SOAPY SOLUTION
31
Grafica R.B. - 09/2001 - Cod. 91500227.A
Page view 17
1 2 ... 13 14 15 16 17 18

Comments to this Manuals

No comments